Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Life extension for Shell’s Draugen (Norway)
Fossil Energy

May 20, 2015 · about 11 years ago

Life extension for Shell’s Draugen (Norway)

A/S Norske Shell has received consent from the Petroleum Safety Authority (PSA) Norway to extend the lifetime of the Draugen platform, in the Norwegian Sea. Draugen is an oil field in the Norwegian Sea, around 150 km north of Kristiansund. A/S Norske Shell (Shell) is the field’s operator. Production

1 minutes read
  • LinkedIn
  • X
  • Email

A/S Norske Shell has received consent from the Petroleum Safety Authority (PSA) Norway to extend the lifetime of the Draugen platform, in the Norwegian Sea.

Draugen is an oil field in the Norwegian Sea, around 150 km north of Kristiansund. A/S Norske Shell (Shell) is the field’s operator.

Production on the field began in October 1993. When Draugen started production in 1993, the field had an estimated life between 17 and 20 years and an estimated recovery rate of under 40%. Draugen has since more than doubled its recoverable reserves, increased production, and is now one of the Norwegian fields with the highest recovery rate of around 70%.

The field has been developed using a fixed concrete platform with an integrated deck. Deposits in the vicinity are produced by subsea wells tied back to the Draugen platform.

According to the PSA, Shell believes there are grounds for producing from Draugen after the production licence expires in 2023 and wishes to apply to the Ministry of Petroleum and Energy to extend the production licence. However, the PSA is unable to grant consent for operations beyond the term of the current production licence.

Shall has therefore received consent to extend the lifetime of the Draugen facility to March 9, 2023, the PSA concludes.

[mappress mapid=”1739″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free