Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›PSA orders Statoil to monitor BOP on Oseberg B and Gullfaks C
Exploration & Production

June 4, 2015 · about 11 years ago

PSA orders Statoil to monitor BOP on Oseberg B and Gullfaks C

Statoil has received notification of order from the Petroleum Safety Authority (PSA) Norway following audits at Oseberg B and Gullfaks C, both located in the Norwegian North Sea. A notification of order is a step in the PSA’s case processing in which the regulator requests the party to assess the fa

2 minutes read
  • LinkedIn
  • X
  • Email

Statoil has received notification of order from the Petroleum Safety Authority (PSA) Norway following audits at Oseberg B and Gullfaks C, both located in the Norwegian North Sea.

A notification of order is a step in the PSA’s case processing in which the regulator requests the party to assess the factual basis. The notification is only the first step before an administrative decision is made.

Between November 10, 2014 and January 29, 2015, the PSA conducted audits at Oseberg B and Gullfaks C. The audits followed up and verified the auditing performed in 2013 relating to the signing of new drilling contracts for Statoil’s fixed facilities.

Result

According to the PSA, the audits found that safety-critical equipment had not been monitored as required in the HSE regulations for petroleum activities. This applies primarily to the BOP control system, which was chosen as a particular object of verification subject during this audit.

The audit detected the following non-conformities: Deficient condition assessment of safety-critical equipment; Inadequate practice for complete overhaul and recertification of pressure control equipment; Deficient verification of programme for maintenance of safety-critical equipment; Deficient risk management of drilling equipment.

Improvement points: Knowledge of performance of barrier elements at Gullfaks C and Oseberg B; Weaknesses in competence, training and drills; Working environment in the drilling facility on Gullfaks C could be improved; There is insufficient assessment of the significance of safety and working environment frameworks, and limited measures have been taken to reduce negative HSE consequences of framework conditions.

The order

Based on the findings made during the audit, the PSA has now given Statoil notice of the following order:

“Pursuant to the Framework Regulations, section 69 concerning administrative decisions, with reference to section 5 of the Management Regulations, concerning barriers, and section 51 of the Activities Regulations, concerning specific requirements for testing of blowout preventer and other pressure control equipment, Statoil is ordered to obtain an overall and up-to-date status picture of the BOP control systems at Oseberg B and Gullfaks C, with reference to chapter 5.1.1 of the report. Based on this status picture, Statoil is ordered to produce a time-delimited, binding schedule of measures for overhauling and recertification, with reference to chapter 5.1.2 of the report.”

The deadline for complying with the order is set at August 4, 2015. The PSA says it is to be notified when the order has been carried out.

[mappress mapid=”1861″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

11 days ago