Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›Wintershall produces first gas from L6-B platform in North Sea
Exploration & Production

June 16, 2015 · about 11 years ago

Wintershall produces first gas from L6-B platform in North Sea

Wintershall has informed that the unmanned mini-platform L6-B has started to produce natural gas off the Dutch North Sea coast. The first so called “Minimum Facility” platform was built in just nine months and brought to its offshore location in June 2014. According to Wintershall, the advantage of

2 minutes read
  • LinkedIn
  • X
  • Email

Wintershall has informed that the unmanned mini-platform L6-B has started to produce natural gas off the Dutch North Sea coast.

The first so called “Minimum Facility” platform was built in just nine months and brought to its offshore location in June 2014.

According to Wintershall, the advantage of this new generation of platforms is that they can be deployed in particularly shallow waters and can economically produce even from very small natural gas fields. Furthermore, they can cut down on costs thanks to the short time needed for construction and the simple installation. The company notes that the costs for such a platform are less than half of a conventional satellite platform.

The platform is located in field L6-B in the middle of a restricted military zone, and Wintershall Noordzee is the first company that is allowed to operate in this area. The installation needs to be as small as possible, and it may well be the smallest topside known.

The facility is anchored in the seabed through suction piles, rises about 18 meters above the sea and has three decks but no helideck. The facility can accommodate maximum 2 producing wells. Since there is only minimum processing equipment on the platform, the expected visit frequency is low, Wintershall said.

The substructure weighs 1,100 tons, the top side just around 100 tons. To compare, the closeby platform L8-P4 weighs 4,500 tons. From there the mini-platform is controlled, operated and supplied with electricity. A pipeline will transport the gas produced in L6-B to the neighbouring platform L8-P4.

[mappress mapid=”1966″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

12 days ago