Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Tenaris wins Mariner project work
Fossil Energy

June 23, 2015 · about 11 years ago

Tenaris wins Mariner project work

Statoil has awarded Tenaris the contract for the supply of casing, tubing and all related services for the Mariner Project located on the UK Continental Shelf (UKCS). Tenaris said it will be providing TenarisHydril Blue and TenarisHydril Wedge connections with Dopeless technology, together with a fu

2 minutes read
  • LinkedIn
  • X
  • Email

Statoil has awarded Tenaris the contract for the supply of casing, tubing and all related services for the Mariner Project located on the UK Continental Shelf (UKCS).

Tenaris said it will be providing TenarisHydril Blue and TenarisHydril Wedge connections with Dopeless technology, together with a full range of services including demand planning, inventory management, delivery to the well, rig returns and repairs that will be managed from Tenaris’ facilities in Aberdeen, UK.

“Tenaris is proud to be part of a project of such scale as Mariner. We’ll work hard to be up to our customer’s expectations in an operation that will take place in one of the most demanding environments. We are committed to delivering a best-in-class service to Statoil and are happy that our extensive portfolio of products and services has given us this opportunity,” said Gabriel Podskubka , Tenaris Eastern Hemisphere Area Manager.

Mariner project

The Statoil operated Mariner field is located on the East Shetland Platform of the UK North Sea, approximately 150 kilometers east of the Shetland Isles. The Mariner oil field consists of two shallow reservoir sections, Maureen Formation at 1492 meters and Heimdal reservoir at 1227 meters.

According to Statoil, the development of the Mariner field will contribute more than 250 mmbbls reserves with average plateau production of around 55,000 barrels per day. The field is estimated to be in production for 30 years, starting in 2017.

The field will be developed by drilling and quarters (PDQ) steel jacket platform, with a floating storage unit. Drilling will be carried out from the PDQ drilling rig, with a jack-up rig assisting for the first 4 to 5 years.

Besides Statoil as the operator of the field with 65.11% equity, other partners include JX Nippon Exploration and Production (U.K.) Limited (28.89%) and Dyas Mariner Ltd. (6%).

[mappress mapid=”2027″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free