Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›OMV: Maari’s last well on production. Rig ready for demobilization
Fossil Energy

July 7, 2015 · about 11 years ago

OMV: Maari’s last well on production. Rig ready for demobilization

Austrian OMV recently informed that its Maari offshore field redevelopment project in New Zealand has been completed. Horizon Oil, a partner in the project, has now reported that the final well, MR10, is on production. OMV previously reported that the well MR10 was being tied-in to the production ne

2 minutes read
  • LinkedIn
  • X
  • Email

Austrian OMV recently informed that its Maari offshore field redevelopment project in New Zealand has been completed . Horizon Oil, a partner in the project, has now reported that the final well, MR10, is on production.

OMV previously reported that the well MR10 was being tied-in to the production network.

According to Horizon Oil, as of July 6, the MR10 well was drilled and completed and it was flowing approximately 2,000 barrels of oil per day (bopd), with daily production of approximately 16,500 barrels of oil per day.

The final flow rate for MR10 will be optimised by OMV New Zealand, the operator of the Maari Joint Venture (JV), based on engineering data collected as the well continues to stabilise, Horizon Oil said in the announcement.

Furthermore, OMV expects the field’s production capacity to increase to approximately 20,000 bopd with the optimisation of production from MR10 and an upcoming 2015 work-over campaign.

A total of four new production wells were drilled in the Maari Growth Program using the Ensco 107 jack-up rig.

Horizon Oil said that the Ensco 107 jack-up drilling rig is being prepared for demobilisation from the Maari Field, and the Maari JV’s work-over unit (WOU) equipment is being prepared for scheduled load out to the wellhead platform in late July 2015. The WOU will be used to carry out maintenance workovers and other activities such as adding perforations to further enhance production. The work-over campaign is scheduled to start after the demobilisation of the Ensco 107.

OMV New Zealand is the operator of the field with 69%, and partners in the JV are Todd Maari 16%, Horizon Oil International 10%, and Cue Taranaki Pty 5%.

[mappress mapid=”2130″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free