Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Pacific Drilling holds off ‘Pacific Zonda’ delivery
Fossil Energy

July 8, 2015 · about 11 years ago

Pacific Drilling holds off ‘Pacific Zonda’ delivery

Pacific Drilling, an offshore drilling contractor, has postponed the delivery of its newbuild drillship Pacific Zonda for the fourth quarter of 2015. Namely, the delivery of the drillship, that is being built at Samsung Heavy Industries yard in South Korea, was postponed for October 2015 although th

2 minutes read
  • LinkedIn
  • X
  • Email

Pacific Drilling, an offshore drilling contractor, has postponed the delivery of its newbuild drillship Pacific Zonda for the fourth quarter of 2015.

Namely, the delivery of the drillship, that is being built at Samsung Heavy Industries yard in South Korea, was postponed for October 2015 although the company’s previous plan was for the vessel to be delivered in the third quarter.

The Pacific Zonda is an upgraded Dual Load Path Samsung 12000 design dynamically-positioned, Dual Gradient capable, drillship operating in moderate environments and water depths up to 3,657 m (12,000 ft) using 183/4n BOP and 21″ OD marine drilling riser. The vessel can accommodate 200 persons.

In addition to delivery delay, Pacific Drilling reported in its latest fleet status report that their 2011-built drillship Pacific Mistral, located in Aruba, is now out of work. The drillship was previously under contract with Brazilian oil giant Petrobras.

The company has a fleet of seven recently built ultra deepwater drillships capable of operating in 10,000 feet water depth and Pacific Zonda is its eighth drillship.

In the current market downturn, many drilling contractors have been forced to delay rig deliveries, Pacific Drilling now being one of them. Recently, reports have emerged about Pacific Drilling being looked at as a takeover candidate by Transocean, Ensco and Seadrill due to Pacific Meltem tender cancellation from Chevron. At the time, Offshore Energy Today asked about potential changes to the delivery date of Pacific Zonda and the company’s spokesperson replied: “There has been no change to the Zonda delivery date.”

Transocean is also one of the companies that recently delayed rig deliveries. Namely, the company agreed with Keppel to postpone deliveries for four of its jack-up rigs.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free