Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Blue Water Shipping Helps Out with Sabella D10 Installation
Offshore Wind

July 9, 2015 · about 11 years ago

Blue Water Shipping Helps Out with Sabella D10 Installation

Blue Water Shipping Brest has assisted French company Sabella SAS with installing their D10 tidal turbine on the seabed off Ushant Island, which is located 30 kilometers off the western tip of Bretagne, France. The installation of the tidal turbine took place during May and June and Blue Water Brest

1 minutes read
  • LinkedIn
  • X
  • Email

Blue Water Shipping Brest has assisted French company Sabella SAS with installing their D10 tidal turbine on the seabed off Ushant Island, which is located 30 kilometers off the western tip of Bretagne, France.

The installation of the tidal turbine took place during May and June and Blue Water Brest assisted Sabella on the full range of services. Initially, by acting as shipbrokers and fixing the cable installation together with Bourbon Subsea Services, which laid the cable from Ushant Island to the installation point at sea with their vessel “Argonaute”.

Next phase was installation of the turbine. This was done by Combi Lift and their vessel M/V “Palembang” with assistance from tug boats holding M/V “Palembang” in position. Blue Water had arranged the tug boats from Boluda France.

“The current at Ushant Island is torrential which makes the installing process extremely complex. It is only possible to work during the so-called neap tides – the time periods where the tide is not so strong – which only occurs few days every month. It was a very tight schedule requiring precise planning and we all worked under pressure,” said Mogens Nielsen, Director Blue Water France .

The turbine was built on the quayside in Brest where Blue Water was also involved in various logistics and stevedoring activities. The latter were handled by Blue Water’s partner ADS.

Image: BWS

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free