Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›KrisEnergy starts production from Wassana field
Fossil Energy

August 17, 2015 · about 11 years ago

KrisEnergy starts production from Wassana field

KrisEnergy Ltd., an independent upstream oil and gas company, has started oil production from the Wassana oil field in the G10/48 concession in the Gulf of Thailand. According to KrisEnergy, the production started Friday, August 14, 2015, which is 15 months after the company became the operator of t

2 minutes read
  • LinkedIn
  • X
  • Email

KrisEnergy Ltd., an independent upstream oil and gas company, has started oil production from the Wassana oil field in the G10/48 concession in the Gulf of Thailand.

According to KrisEnergy, the production started Friday, August 14, 2015, which is 15 months after the company became the operator of the G10/48 block.

Chris Gibson-Robinson , Director Exploration & Production, commented: “Wassana is KrisEnergy’s first operated oil project and the start of production marks a major milestone in the Company’s evolution. Work is now underway to bring another five wells on stream and to optimise production in this initial wave of drilling.

“This field is the first of a series of KrisEnergy-operated developments we are working on in Thailand, Cambodia and Indonesia.”

According to KrisEnergy’s press release, Wassana production is expected to reach a peak rate of approximately 10,000 barrels of oil per day (bopd) as additional development wells are drilled and completed by the Key Gibraltar jack-up rig. Up to 15 development wells are planned, 14 producer wells and one water disposal well. The Wassana infrastructure comprises a mobile offshore production unit (MOPU), the MOPU Ingenium, a mooring buoy and the Rubicon Vantage floating storage offloading vessel.

The G10/48 contract area covers 4,696 sq. km over the Southern Pattani Basin in water depths of up to 60 metres. The contract area contains three other discoveries – Niramai and Mayura from 2009 and Rayrai in 2015. KrisEnergy holds an effective 89% working interest in G10/48 and Palang Sophon Offshore holds an effective 11% working interest.

In the Gulf of Thailand, KrisEnergy has non-operated working interests in the B8/32, B9A and G11/48 producing blocks and is the operator of G10/48 and G6/48, where it drilled four exploration wells in 2015 and has subsequently submitted a plan of development for the Rossukon oil field.

It also operates Block A across the maritime border in Cambodian waters, where it is seeking to develop the Apsara oil field.

[mappress mapid=”2422″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free