Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Environment›IMarEST publishes Metocean Procedures Guide
Environment

September 22, 2015 · about 11 years ago

IMarEST publishes Metocean Procedures Guide

The Institute of Marine Engineering, Science & Technology (IMarEST) has published a seminal Metocean Procedures Guide for Offshore Renewables. The guide highlights the meteorological and oceanographic (metocean) information required to support all phases of an offshore renewable energy project, thro

1 minutes read
  • LinkedIn
  • X
  • Email

The Institute of Marine Engineering, Science & Technology (IMarEST) has published a seminal Metocean Procedures Guide for Offshore Renewables.

The guide highlights the meteorological and oceanographic (metocean) information required to support all phases of an offshore renewable energy project, through development and construction to ongoing operations and maintenance, according to IMarEST.

Developed by the IMarEST’s Offshore Renewables Special Interest Group, the guide represents a tool for all those involved in offshore renewables, including project managers, structural engineers, surveyors and logistics personnel based within offshore renewable companies or support organisations and contractors.

Metocean is primarily concerned with quantifying the effects of weather and sea conditions (specifically wind, wave, current and water level) and more broadly on the physical aspects of the water column (such as conductivity and temperature).

Zoe Roberts , Senior Metocean Analyst at Vattenfall Wind Power, said: “The Metocean Procedures Guide provides a concise strategy for ensuring that metocean is not neglected early in the project lifecycle, thus avoiding headaches in design, construction and operation later on.”

As well as discussing metocean strategy, data sources and management and metocean standards, the documents includes a concise list of references, applicable standards and a glossary of terms.

IMarEST has registered charity status and represents the institution that brings together marine engineers, scientists and technologists into one international multi-disciplinary professional body.

Image: IMarEST

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EnvironmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 1 month ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 1 month ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago