Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Gallery: Helideck installation on Ivar Aasen Living Quarters
Fossil Energy

October 21, 2015 · about 11 years ago

Gallery: Helideck installation on Ivar Aasen Living Quarters

Det norske oljeselskap AS, the operator of the Ivar Aasen field in the North Sea, has shared images of a helideck being lifted on top of the Living Quarters (LQ) for the Ivar Aasen platform, being built by Apply Leirvik in its construction site in Stord, Norway. According to Det norske, it took thre

2 minutes read
  • LinkedIn
  • X
  • Email

Det norske oljeselskap AS, the operator of the Ivar Aasen field in the North Sea, has shared images of a helideck being lifted on top of the Living Quarters (LQ) for the Ivar Aasen platform, being built by Apply Leirvik in its construction site in Stord, Norway.

According to Det norske, it took three hours to place the helideck, weighing just under 100 tons, in position. The helideck was built and assembled in China, and lifted into place by Eide Marine Services.

To remind, in February 2013, the Singapore-based Sembcorp Marine was selected by Det norske to build the Process, Drilling and Quarters Platform (pdQ) Topsides for the Ivar Aasen development. Sembcorp Marine in turn selected the Norwegian living quarters and helideck contractor Apply Leirvik for delivery of the LQ with a helideck.

Under the contract, Apply will deliver a 7 floor Living Quarters module with an area of 3300 m2, a capacity of 70 single cabins, recreation areas, control room, administration centre, change rooms, helicopter deck and other facilities required for operation of an offshore hotel. Engineering work started in 2013, and the delivery is expected in the first quarter 2016.

The Ivar Aasen field is located on the Utsira High in the North Sea, and is expected to reach peak production of about 75 000 barrels oil equivalents per day. The field has an anticipated economic life of 20 years, and Det norske’s share is 34.8 per cent.

Offshore Energy Today Staff

[mappress mapid=”2793″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyEquipmentExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free