Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Heinen & Hopman to Look After HVAC System at Eneco Luchterduinen
Wind Farms

February 22, 2016 · about 10 years ago

Heinen & Hopman to Look After HVAC System at Eneco Luchterduinen

Heinen & Hopman has secured a five-year contract from Eneco to supply 24/7 service and maintenance for the HVAC (Heating, Ventilation and Air Conditioning) system at the 129 MW Eneco Luchterduinen offshore wind farm. The company also supplied the HVAC system for the wind farm. The HVAC is especially

1 minutes read
  • LinkedIn
  • X
  • Email

Heinen & Hopman has secured a five-year contract from Eneco to supply 24/7 service and maintenance for the HVAC (Heating, Ventilation and Air Conditioning) system at the 129 MW Eneco Luchterduinen offshore wind farm.

The company also supplied the HVAC system for the wind farm.

The HVAC is especially important for the Offshore High Voltage Station (OHVS), the company said. The OHVS receives the electricity generated by the wind farm’s 43 V112-3.0MW MHI Vestas turbines and transforms it from 33 kV to 150 kV before transmission back to shore.

The OHVS is equipped with many transformers, GIS and switchgears, which generate significant amounts of heat. This heat needs to be dissipated from the area in order to prevent overheating and failures of the OHVS, and cooling is essential for proper functioning of the vital parts of the substation and wind turbines.

Eneco Luchterduinen is located 23 kilometres off the west coast of the Netherlands, between Noordwijk and Zandvoort. The wind farm was built throughout 2014 and 2015.

Luchterduinen has been fully operational since September 2015, supplying wind power to almost 150.000 Dutch households, and yielding a CO2 emission reduction of 275.000 tonnes.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsBusiness & FinanceOperations & MaintenanceStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free