Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›DeepOcean Takes Over Maersk Connector
News

February 26, 2016 · about 10 years ago

DeepOcean Takes Over Maersk Connector

The new advanced cable installation vessel, Maersk Connector, has arrived to North East England to start a long-term charter with the Darlington-based DeepOcean. The vessel will be used for the mobilisation of specialist cable handling equipment for projects in the offshore renewables and subsea int

2 minutes read
  • LinkedIn
  • X
  • Email

The new advanced cable installation vessel, Maersk Connector, has arrived to North East England to start a long-term charter with the Darlington-based DeepOcean.

The vessel will be used for the mobilisation of specialist cable handling equipment for projects in the offshore renewables and subsea interconnector sectors.

DeepOcean has secured offshore renewable and interconnector projects worth in the region of GBP 200 million, some of which were unlocked having secured the charter of the vessel.

Initially, the Maersk Connector will be utilised to install subsea array cables for the Bligh Bank Phase II offshore wind farm (Nobelwind) off Belgium, before laying subsea export cables for the 660MW Walney Extension offshore wind farm in the Irish Sea.

Subsequently the vessel will install a subsea interconnector cable between Belgium and the UK, the Nemo Link, which will increase the supply of power to Britain from the continent supporting the reduction in the cost of electricity.

The 138m-long vessel has docked at A&P Tyne’s yard in the North East of England where it will be fitted with an advanced split capacity carousel produced by Parkburn Precision Handling Systems. Fabricated at A&P facility on the River Tyne, the carousel has an outer diameter of 27.3m and is 7.5m tall, enabling the vessel to carry 7,000 tonnes of cable.

The installation of the carousel and associated equipment, which will be managed by DeepOcean, will be carried out at the A&P yard over a two-month period before it embarks on its first project in Belgian waters in the summer.

DeepOcean has also engaged IHC to deliver an advanced cable plough for the vessel, which will be fitted later in the year at the Port of Blyth for projects in 2017.

The Maersk Connector is the only vessel with the ability to ground when fully loaded allowing DeepOcean to install cables from the beach, in shallow and deep waters. It will be crewed by 90 people, which will include 70 of DeepOcean’s specialist offshore personnel.

Pierre Boyde, Commercial Director of DeepOcean, said: ”The investment in the Maersk Connector represents DeepOcean’s increasing presence in the offshore renewables and interconnector markets. Our continued growth in these sectors supports a programme of research and development to improve offshore operations, which includes establishing productive, long-term relationships with the supply chain.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore adds deepwater firepower to managed fleet and wins Petronas rig deal
  2. 2Boost for Europe’s energy diversification and cross-border gas flows as Western Balkans plug into Vertical Corridor
  3. 3NKT inaugurates expanded power cable factory in Denmark
  4. 4OneSubsea to support Azule Energy’s production shift from aging to new FPSO

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free