Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›DolWin3 Project Moving Forward
Storage

March 8, 2016 · about 10 years ago

DolWin3 Project Moving Forward

Two 685 MVA power transformers have been delivered and installed in the land-based converter station Dörpen West, which is part of the DolWin3 project. The power transformers have been developed, manufactured and tested according to the specific needs of the project at GE’s site in Mönchengladbach.

1 minutes read
  • LinkedIn
  • X
  • Email

Two 685 MVA power transformers have been delivered and installed in the land-based converter station Dörpen West, which is part of the DolWin3 project.

The power transformers have been developed, manufactured and tested according to the specific needs of the project at GE’s site in Mönchengladbach.

The DolWin3 project, the third network connection in the DolWin wind farm cluster in southwestern North Sea, is on schedule and should be completed in 2017, TenneT reported.

The offshore grid connection project has a capacity of 900MW for the integration of wind energy into the German transmission network. Completion of the project will enable the supply of around one million households in Germany with clean energy.

Offshore WIND Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago