Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Modec selects Keppel for $136M FPSO module work
News

April 6, 2016 · about 10 years ago

Modec selects Keppel for $136M FPSO module work

Singapore’s Keppel Offshore & Marine Ltd has been awarded a Floating Production Storage and Offloading (FPSO) module fabrication and integration project by the Japanese FPSO owner Modec. The work will be carried out in Brazil by Keppel’s subsidiary’s Keppel FELS Brasil SA’s BrasFELS shipyard. The va

2 minutes read
  • LinkedIn
  • X
  • Email

Singapore’s Keppel Offshore & Marine Ltd has been awarded a Floating Production Storage and Offloading (FPSO) module fabrication and integration project by the Japanese FPSO owner Modec.

The work will be carried out in Brazil by Keppel’s subsidiary’s Keppel FELS Brasil SA’s BrasFELS shipyard. The value of the deal has been estimated at more than 500 million Brazilian reals ($136 million).

Under this contract, BrasFELS will build and integrate nine topside production modules for the FPSO Cidade de Campos dos Goytacazes MV29. The vessel is expected to arrive at the shipyard by the first quarter of 2017 for the integration phase.

When completed, the FPSO Cidade de Campos dos Goytacazes MV29 will have the capacity to process 150,000 barrels of oil per day (bopd) and 5 million cubic meters of gas per day. The unit’s storage capacity is 1.6 million barrels of oil.

Slated to depart the shipyard in the third quarter of 2017, the FPSO will be deployed at Tartaruga Verde and Tartaruga Mestiça Fields, in the Campos Basin, off the coast of Rio de Janeiro.

This is not the only projec BrasFELS is working on for Modec. Namely, the yard is also responsible on the integration and commissioning of the FPSO Cidade de Caraguatatuba MV27. The FPSO is expected to arrive at BrasFELS in the second quarter of 2016, and will be deployed in the Lapa Field, Santos Basin, Brazil. The FPSO Cidade de Itaguaí MV26, which was delivered by BrasFELS to Modec in mid-2015 achieved first oil production four months ahead of the schedule, in the Iracema Norte Area of Lula Field in Brazil.

In the past five years, BrasFELS delivered five FPSO projects, three of which were for Modec.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free