Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›E.ON Selects Nexans Subsea Cables for Arkona
Business & Finance

May 4, 2016 · about 10 years ago

E.ON Selects Nexans Subsea Cables for Arkona

Nexans Deutschland has won a contract to supply 76 kilometres of subsea energy cables to E.ON for the 385MW Arkona offshore wind farm. The cables, which will be manufactured in Nexans’ Hanover plant, are designed for operation at 33 kV and will serve as the internal cabling for the wind farm which i

2 minutes read
  • LinkedIn
  • X
  • Email

Nexans Deutschland has won a contract to supply 76 kilometres of subsea energy cables to E.ON for the 385MW Arkona offshore wind farm.

The cables, which will be manufactured in Nexans’ Hanover plant, are designed for operation at 33 kV and will serve as the internal cabling for the wind farm which is to be built between the Baltic Sea islands of Rügen and Bornholm and expected to be commissioned in 2019.

The order includes 48 kilometres of three-phase cables with a 300 mm² cross-section and 28 kilometres of cables with an 800 mm² cross-section, along with the fittings and accessories needed for installation.

The cables will connect the 60 wind turbines to each other and to the transformer platform. To cope with the high currents produced when a series of wind turbines are interconnected, Nexans 33 kV submarine cables with a large 800 mm² cross-section will be used at Arkona for the first time.

The delivery of the subsea cables is scheduled for the beginning of 2018. The point of delivery will be the ferry port of Sassnitz, Rügen, chosen last summer by E.ON as the logistics hub for this project.

The Arkona order is the first contract for submarine cables between E.ON and Nexans Deutschland.

E.ON has a 50% stake in the offshore project and is in charge of constructing and operating the wind farm. The energy company Statoil holds the remaining 50% stake in the project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago