Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Sandbank OSS Installed (Gallery)
News

May 10, 2016 · about 10 years ago

Sandbank OSS Installed (Gallery)

The installation of Sandbank offshore wind farm’s offshore substation has been completed. It took around three hours to lift the topside from the transport ship and place it on the 51 metres high jacket foundation. The positioning and installation of the substation at sea, placed in water depth of 2

1 minutes read
  • LinkedIn
  • X
  • Email

The installation of Sandbank offshore wind farm’s offshore substation has been completed.

It took around three hours to lift the topside from the transport ship and place it on the 51 metres high jacket foundation. The positioning and installation of the substation at sea, placed in water depth of 28 metres, was carried out by the installation vessel Stanislav Yudin.

The 288MW Sandbank offshore wind farm is located 90 kilometres off the coast of Sylt in the German North Sea.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free