Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›VBMS Wraps Up Sandbank OWF Wiring
Storage

June 17, 2016 · about 10 years ago

VBMS Wraps Up Sandbank OWF Wiring

VBMS has completed cable installation and post-lay burial work at Vattenfall’s 288MW Sandbank offshore wind farm, situated in the German Bight. The company installed a total of 76 inter-array cables within approximately two and a half months. VBMS deployed its multipurpose vessels Ndurance and Ndeav

1 minutes read
  • LinkedIn
  • X
  • Email

VBMS has completed cable installation and post-lay burial work at Vattenfall’s 288MW Sandbank offshore wind farm, situated in the German Bight.

The company installed a total of 76 inter-array cables within approximately two and a half months.

VBMS deployed its multipurpose vessels Ndurance and Ndeavor in order to simultaneously perform cable installation and placement of messenger wires, cable burial, cable connection, and cable testing works. For the project, the company launched its in-house post-lay burial ROV 107-1100.

“By accommodating all personnel working on the towers onboard the Ndurance and the Ndeavor, we minimised transfer times which contributed to maximum efficiency in execution of the works too,” said Ruud Kromwijk , project manager at VBMS. “By deploying in-house personnel, vessels and equipment we have proven ourselves capable of executing subsea cable installation works to the highest safety- and quality standards within the industry and also within challenging offshore environments in a very limited time frame.”

Cable connection and cable testing works are expected to be completed at the end of July.

When completed in 2017, the Sandbank offshore wind farm will have 72 Siemens 4MW wind turbines and will be able to supply more than 400,000 households with renewable electricity.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago