Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›Safety watchdog spots irregularities during Teekay FPSO audit
FPSO

July 22, 2016 · about 10 years ago

Safety watchdog spots irregularities during Teekay FPSO audit

Norwegian offshore safety body, the Petroleum Safety Authority, has found several irregularities and improvement points during an audit of Teekay Petrojarl, a floating production, storage and offloading (FPSO) operator in the North Sea. PSA’s audit, conducted aboard the Knarr FPSO, focused on overal

1 minutes read
  • LinkedIn
  • X
  • Email

Norwegian offshore safety body, the Petroleum Safety Authority, has found several irregularities and improvement points during an audit of Teekay Petrojarl, a floating production, storage and offloading (FPSO) operator in the North Sea.

PSA’s audit, conducted aboard the Knarr FPSO, focused on overall barrier management, examining the interactions between operational, organizational and technical barrier elements.

The safety body said on Friday that the objective of the audit was to monitor regulatory compliance concerning barriers and to verify that technical, operational and organizational barrier elements have been maintained in an integrated and consistent manner to minimize the risk of major accidents to the greatest extent possible.

Also, PSA said that the residual risk must be properly handled through well-planned emergency preparedness and a robust emergency preparedness organization.

The audit identified two non-conformities in regards to barrier strategies and the training of emergency responders.

Furthermore, four improvement points were noted during the audit, in connection with competence, performance-influencing factors in the central control room, maintenance management and flanges on the turbines’ gas pipe.

PSA told Teekay that the deadline to report on how the non-conformities and improvement points will be dealt with is August 31.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free