Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›TenneT to Break Ground for NordLink Mid-September
Offshore Wind

July 29, 2016 · about 10 years ago

TenneT to Break Ground for NordLink Mid-September

Transmission system operator TenneT will hold a ground breaking ceremony for the 1.4GW NordLink, a subsea HVDC power cable which will connect Norwegian and German power grids, in Wilster, Schleswig-Holstein, Germany, on 16 September. Stretching over 623 kilometers, the NordLink interconnection is ra

1 minutes read
  • LinkedIn
  • X
  • Email

Transmission system operator TenneT will hold a ground breaking ceremony for the 1.4GW NordLink, a subsea HVDC power cable which will connect Norwegian and German power grids, in Wilster, Schleswig-Holstein, Germany, on 16 September.

Stretching over 623 kilometers, the NordLink interconnection is rated at ±525 kilovolt (kV), and it will be the first direct power link between the German and Norwegian electricity markets once it is completed at the end of 2019.

The link will enable power trading of renewable energy between the two countries. Germany’s surplus renewable power can be transmitted via NordLink to help Norway cope with high power demand and conserve water in its many hydropower reservoirs. At the other end of the link, Norway can export hydropower to help Germany meet fluctuating daily power demand.

Back in March 2015, ABB won a contract to design, engineer, supply and commission two ±525 kV, 1,400 MW converter stations for the project. One station will be situated near Tonstad in southern Norway and the other near Wilster, where the ground-breaking ceremony will be held

ABB will also design, manufacture and install the 525 kV mass impregnated (MI) cable system in the German sector, with a route of 154 km submarine and 54 km underground.

The NordLink is a joint project of Tennet, Norway’s Statnett and Kfw.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free