Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Balfour Beatty and LMR to Drill Borehole for Hywind Cables
Wind Farms

August 1, 2016 · about 10 years ago

Balfour Beatty and LMR to Drill Borehole for Hywind Cables

Balfour Beatty and subcontractor LMR are getting ready to perform marine works nearshore Peterhead, Scotland, for Statoil’s 30MW Hywind Scotland Pilot Park, Kis-Orca reports. The marine works will be carried out in the period of approximately 8 to 20 August 2016, and will involve drilling of a 660 m

1 minutes read
  • LinkedIn
  • X
  • Email

Balfour Beatty and subcontractor LMR are getting ready to perform marine works nearshore Peterhead, Scotland, for Statoil’s 30MW Hywind Scotland Pilot Park, Kis-Orca reports.

The marine works will be carried out in the period of approximately 8 to 20 August 2016, and will involve drilling of a 660 metre borehole from Barclay Park in Peterhead out to an exit point approximately 450 metres out in the sea.

The marine operations involve the use of a multi-cat vessel, MCS Ailsa, which will be anchored at the exit point and used as support vessel during the breakthrough and diving operations.

A single duct, slightly longer than the borehole, will then be towed to the borehole exit point from Peterhead Harbour using two tug work boats, Shemarah II LH65 and Astern Vessel Moremma PD135, and pulled back into the borehole.

A rigid inflatable boat (RIB) will be used to assist the operation and act as an emergency vessel and also for personnel/diver transfer.

The Hywind floating wind farm will be located some 25 kilometres from Peterhead, northeast Scotland. It will consist of five 6MW Siemens turbines, anchored in waters exceeding 100 meters of depth.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free