Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›EDS HV Management to Watch Over Blyth 66kV Cable
Wind Farms

August 19, 2016 · about 10 years ago

EDS HV Management to Watch Over Blyth 66kV Cable

High voltage engineering specialist EDS HV Management has been appointed to act on behalf of EDF Energy Renewables (EDF ER) as owner’s engineers monitoring the cable manufacture for the 41.5MW Blyth offshore wind demonstration project in Northumberland. The offshore wind farm, located 5.7km off the

2 minutes read
  • LinkedIn
  • X
  • Email

High voltage engineering specialist EDS HV Management has been appointed to act on behalf of EDF Energy Renewables (EDF ER) as owner’s engineers monitoring the cable manufacture for the 41.5MW Blyth offshore wind demonstration project in Northumberland.

The offshore wind farm, located 5.7km off the North East coast will initially comprise of 5 optimised MHI Vestas 8.3MW turbines, although it has consent for up to 15 turbines when fully constructed.

The project will be the first ever to use 66kV cable . As owner’s engineer, EDS HV Management will monitor the cable on a 24/7 basis during manufacturing, testing and transportation. This includes, amongst other things, reviewing and advising on the design of the cable, and offering expertise on testing and quality assurance throughout the process.

Ryan Henderson, EDS HV Management Group Director said: “We are delighted to offer our services as Owner’s Engineer to EDF. The move towards 66kV requires a whole new set of required skills and competence and as a business we are constantly investing to stay ahead of the game. Having already established a relationship with EDF ER through our work at Teesside Offshore Wind Farm, we are delighted that our expertise has again been recognised with the award of this highly significant contract.”

Back in July, EDS HV signed a contract with VBMS to carry out cable termination and testing at the Blyth demo wind farm.

The scope of work for VBMS includes the supply and installation of a total of approximately 14 kilometres of export and inter-array cable, the landfall pull ashore, and testing, terminations and commissioning services.

VBMS will be using one or more of its cable-laying vessels and burial tools and has contracted Nexans as the supplier for the 66kV inter-array cables. Work is scheduled to commence in 2017. The wind farm is expected to be up and running by the 3rd quarter of 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsStorageTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free