Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Erskine field waiting for Shell nod to boost output
News

August 23, 2016 · about 10 years ago

Erskine field waiting for Shell nod to boost output

Less than a month after the Erskine field in the North Sea resumed production, following a prolonged shut-in caused by pipeline blockage, the field has yet to reach its full output. The Chevron-operated Erskine field includes a normally unattended platform and is remotely controlled from Shell’s Lom

1 minutes read
  • LinkedIn
  • X
  • Email

Less than a month after the Erskine field in the North Sea resumed production, following a prolonged shut-in caused by pipeline blockage, the field has yet to reach its full output.

The Chevron-operated Erskine field includes a normally unattended platform and is remotely controlled from Shell’s Lomond platform. An 18.6 mile (30 km) pipeline links the two platforms.

Following the restart on July 27 , it had been planned that the Erskine field would ramp-up production to pre-shut-in levels following a brief pipeline clean-up operation in the first week of August.

However, it seems the Erskine field will have to wait some more. Namely, Serica, a partner in the Erskine field, has been informed by Shell, the operator of Lomond, that the work on recommissioning on Lomond export facilities has taken longer than planned.

Further work is required on the main Erskine condensate export pump, located on Lomond, before it can be brought fully on-line. This now means that resumption of full, continuous production of Erskine has been delayed.

Serica did not provide the exact date of the expected production ramp-up, but said Shell had advised “that this is likely to take several more days.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free