Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›NordLink Breaks Ground
Storage

September 16, 2016 · about 10 years ago

NordLink Breaks Ground

TenneT, Statnett and KfW (represented by KfW IPEX-Bank) launched the construction of the NordLink interconnector by driving the first spade into the ground and performing a symbolic cable pulling today in Wilster, Germany. The ground breaking ceremony for the subsea HVDC power cable which will conne

1 minutes read
  • LinkedIn
  • X
  • Email

TenneT, Statnett and KfW (represented by KfW IPEX-Bank) launched the construction of the NordLink interconnector by driving the first spade into the ground and performing a symbolic cable pulling today in Wilster, Germany.

The ground breaking ceremony for the subsea HVDC power cable which will connect Norwegian and German power grids was attended by Robert Habeck, Minister of Energy of the German state of Schleswig-Holstein, Norwegian Ambassador Elisabeth Waalas, the mayors of the northern German towns of Wilster and Nortorf, as well as a large number of politicians at national, regional and state level.

The 1.4GW NordLink, rated at ±525 kilovolt (kV), will stretch over 623 kilometers and will be the first direct power link between the German and Norwegian electricity markets once it is completed at the end of 2019.

The link will enable power trading of renewable energy between the two countries.

Germany’s surplus renewable power can be transmitted via NordLink to help Norway cope with high power demand and conserve water in its many hydropower reservoirs. At the other end of the link, Norway can export hydropower to help Germany meet fluctuating daily power demand.

ABB will design, engineer, supply and commission two ±525 kV, 1,400MW converter stations for the project.

One station will be situated near Tonstad in southern Norway and the other near Wilster, where the ground-breaking ceremony was held.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago