Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Spotted: Genting Dream Shines Bright
Shipbuilding

September 29, 2016 · about 10 years ago

Spotted: Genting Dream Shines Bright

The image above shows Genting Dream, the first ship being built for Asian Dream Cruises line, equipped with an external lighting system by Finnish engineering company Wärtsilä. Built at German Meyer Werft shipyard, the 151,300 gross ton ship features a length of 335 meters and a width of 37.9 meters

1 minutes read
  • LinkedIn
  • X
  • Email

The image above shows Genting Dream, the first ship being built for Asian Dream Cruises line, equipped with an external lighting system by Finnish engineering company Wärtsilä.

Built at German Meyer Werft shipyard, the 151,300 gross ton ship features a length of 335 meters and a width of 37.9 meters.

The Dynamic Exterior Lighting concept provides a “stunning visual effect” to the ship’s exterior profile. It has been engineered and installed by Wärtsilä Funa in cooperation with the owner and the shipyard.

“This lighting concept will change the way people see a cruise ship arriving or departing the harbours of the world,” Frank Meyer, Project Manager, Wärtsilä Funa International , said.

On September 18, the river conveyance of the Genting Dream officially started from Meyer Werft shipyard, marking the start of the ship’s journey to Guangzhou, China, where it will begin service on November 13, 2016.

The Genting Dream is the first of two cruise vessels being built for Dream Cruises, a part of Genting Hong Kong. It will be able to accommodate 3,400 passengers and 2,000 crew. Its sister ship, the World Dream, is scheduled for delivery in late 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free