Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Klaipedos Nafta starts capacity allocation at LNG reloading facility
News

October 12, 2016 · about 10 years ago

Klaipedos Nafta starts capacity allocation at LNG reloading facility

Klaipedos Nafta said that in preparations to start the operations of its LNG reloading station currently under construction in Klaipeda, the company has started capacity allocation from 2017.

2 minutes read
  • LinkedIn
  • X
  • Email

Klaipedos Nafta said that in preparations to start the operations of its LNG reloading station currently under construction in Klaipeda, the company has started capacity allocation from 2017.

Klaipedos Nafta, the operator of Lithuania’s LNG terminal in the port of Klaipeda, is expanding its infrastructure and constructing an LNG reloading station.

The company is expecting the facility to begin operations next year, providing LNG reload to road trucks/trailers and liquefied natural gas bunkering for LNG-fueled vessels, a statement issued on Wednesday shows.

“The LNG reloading station will allow to load LNG on trucks and provide LNG bunker fuel for ships in the port of Klaipeda. It is crucially important to plan the services for 2017 in order to have a successful start of operations, therefore we are starting to allocate the capacities and prepare the annual delivery program as soon as possible,” said Mantas Bartuška , general manager of Klaipedos Nafta.

The LNG reloading station will consist of five storage tanks with a 1.000-cbm capacity each, leaving a possibility to expand the station for up to 10 storage tanks. The facility will have the maximum throughput capacities of 250.000-cbm annually with two truck loading bays and a jetty for ship bunkering.

The company has already finished soil cleaning and is preparing the construction site, and two cryogenic LNG storage tanks are currently manufactured and being tested.

In August of 2017, two storages of five will start commercial operations and in 2018 the facility will start operations at full capacities.

Klaipedos Nafta said that the commissioning cargo will be bought in the near future.

The European Union has commissioned the project with €9.1 million (Approx. US$10 million) from the program Connecting Europe Facility Motorways of the Sea.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free