Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›VBMS Floats New Export Cable Shore Landing Method (VIDEO)
Research & Development

November 4, 2016 · about 9 years ago

VBMS Floats New Export Cable Shore Landing Method (VIDEO)

VBMS has recently executed the first export cable shore landing for the 336MW Galloper offshore wind farm utilising its newly invented method for lowering the cable onto the seabed by using a remotely controlled progressive buoyancy release system which eliminates the need for divers, wet riggers or

2 minutes read
  • LinkedIn
  • X
  • Email

VBMS has recently executed the first export cable shore landing for the 336MW Galloper offshore wind farm utilising its newly invented method for lowering the cable onto the seabed by using a remotely controlled progressive buoyancy release system which eliminates the need for divers, wet riggers or support vessels.

The company said that the new method is a response to a growing market demand for minimising the use of divers during operations by the development of a new method for floating pull-ins.

Building on previous collaboration, VBMS further developed an application of the Unique Group’s Seaflex buoyancy system called SeaSerpent.

The controlled progressive lowering of the cable onto the seabed is remotely operated from the beach or an installation vessel, positioning the cable accurately along the route without risking the integrity of the cable.

All rigging materials, including buoyancy devices, are recovered from the cable directly, after which the trenching operation can commence without any further intervention, VBMS says.

The company tested the method at the Galloper shore landing on the coast of Suffolk, UK. The shore landing, entailing a 700-metre export cable pull-in and lowering of the cable onto the seabed, was performed in seven hours, according to VBMS. The progressive lowering itself took five minutes to complete.

Toby Edmonds, Project Director at Galloper Wind Farm Limited (GWFL) said: “The installation went smoothly and to time, and we look forward to replicating that performance next Spring when the second and final export cable is installed. The new technology that VBMS deployed on the Galloper project is a great example of how the industry is continuing to think innovatively and progressively to increase safety, manage interfaces, and reduce installation costs.”

Project partner innogy SE is leading the development and construction of the GBP 1.5 billion Galloper project on behalf of all of the project partners, including Siemens Financial Services, UK Green Investment Bank, and Macquarie Capital.

The wind farm is an extension of the existing and fully operational Greater Gabbard and will comprise 56 Siemens wind turbines, each with a capacity of 6MW, installed some 27km off the coast.

The offshore construction phase started in June 2016 and is expected to be completed in late 2017. The wind farm is expected to commence operations in March 2018.

Video: VBMS/YouTube

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & DevelopmentStorageTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

18 days ago