Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Statoil kicks off production drilling on Mariner (VIDEO)
Fossil Energy

December 2, 2016 · about 9 years ago

Statoil kicks off production drilling on Mariner (VIDEO)

Norwegian oil company Statoil has started production drilling on the Mariner field in the UK North Sea. Statoil said on Friday that up to five wells will be drilled before the Mariner A platform hook up and commissioning activity starts next summer. First oil is expected to be produced from Mariner

2 minutes read
  • LinkedIn
  • X
  • Email

Norwegian oil company Statoil has started production drilling on the Mariner field in the UK North Sea.

Statoil said on Friday that up to five wells will be drilled before the Mariner A platform hook up and commissioning activity starts next summer. First oil is expected to be produced from Mariner in 2018.

Hedda Felin , managing director, Statoil Production UK said, “This is an exciting period for us as a UKCS operator as we transition from the planning phase to active offshore operations.”

“Predrilling enables production to reach plateau levels more quickly after the start of operations on Mariner A. It will also be an important learning period for us in terms of understanding the reservoir and identifying potential efficiencies for future wells, with safety and the protection of the environment being our fundamental priorities.”

According to the company, the Noble Lloyd Noble, the largest jack-up rig in the world, is currently positioned over the Mariner jacket which was installed in 2015. The first production wells will be drilled through a well deck on the jacket. Up to five wells will be drilled before the platform topside modules arrive mid-2017. In total up to 100 reservoir targets could be drilled over the lifetime of the Mariner field, based on the current development strategy.

Statoil’s major contractors are Noble Drilling and Schlumberger. The rig contract was awarded to Noble Drilling in 2013, followed by the contract award for integrated drilling and completion services to Schlumberger in 2014. The pre-drilling campaign will support around 500 jobs in the UKCS.

The Mariner topside modules are currently under construction at Daewoo Shipbuilding & Marine Engineering Co., Ltd. (DSME) in South Korea and sailaway is expected in the first half of 2017.

Mariner is one of the largest projects currently under development in the UKCS. Contracts worth over £1 billion have been awarded to date to the UK supply chain by the project.

Statoil (U.K.) Limited is the operator of Mariner with 65.11% equity. Co-venturers are J.X. Nippon Exploration & Production (UK) Limited (20 %), Siccar Point Energy (8.89%) and Dyas Mariner Limited (6%).

The Mariner field is located on the East Shetland Platform of the UK North Sea, approximately 95 miles or 150 kilometers east of the Shetland Isles. The heavy oil field has reserves estimated at more than 250 million barrels of oil with an average plateau production of around 55,000 barrels per day.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & ProductionProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free