Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Cheniere’s Corpus Christi LNG nears halfway mark
News

December 20, 2016 · about 9 years ago

Cheniere’s Corpus Christi LNG nears halfway mark

Cheniere’s second liquefaction and export project, Corpus Christi, located on the U.S. Gulf Coast has reached 47.1 percent completion.

1 minutes read
  • LinkedIn
  • X
  • Email

Cheniere’s second liquefaction and export project, Corpus Christi, located on the U.S. Gulf Coast has reached 47.1 percent completion.

According to the latest monthly report by Cheniere, engineering has progressed to 99.7 percent, procurement has progressed to 64.1 percent, while Bechtel’s direct hire construction through November was 18.5 percent.

During the month of November, the erection of structural steel, setting of the mechanical equipment, installation of aboveground pipe, cable tray and the amine underground pipe and firewater pipe continued at the Train 1.

Concrete placement was completed in the hot oil surge drum and sump, compressor substation piperack, HVAC North foundation, amine storage and thermal oxidizer and amine regen and acid gas removal area.

One of the milestones during November was the raising of the roof of the LNG storage tank C while the construction of bearing ring continued on the LNG tank A.

In the marine area, drilling and placing shafts at the east jetty continued as well as the concrete placement at the jetty’s columns and trestles.

Activities planned for the month of December 2016 are on track, Cheniere said in the report.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free