Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›PHOTO: Petrobras FPSO hull ready for integration ops
FPSO

December 26, 2016 · about 9 years ago

PHOTO: Petrobras FPSO hull ready for integration ops

Brazilian oil giant Petrobras informed on Friday that the hull for the P-68 FPSO has arrived at a Brazilian shipyard for integration operations. The hull for Petrobras’ FPSO unit, meant for the Santos Basin offshore Brazil, arrived at Sembcorp Marine’s Jurong Aracruz shipyard in Brazil on Wednesday,

2 minutes read
  • LinkedIn
  • X
  • Email

Brazilian oil giant Petrobras informed on Friday that the hull for the P-68 FPSO has arrived at a Brazilian shipyard for integration operations.

The hull for Petrobras’ FPSO unit, meant for the Santos Basin offshore Brazil, arrived at Sembcorp Marine’s Jurong Aracruz shipyard in Brazil on Wednesday, December 21. Jurong will conduct the fabrication of the modules and the integration of the FPSO, which consists of interconnecting of all the modules and platform equipment.

Sembcorp’s shipyard in Brazil won a contract worth around $674 million for modules construction and integration for two FPSO units, P-68 and P-71, in August 2012. The contract was for the construction of a total of 8 modules and module integration works on two FPSOs, which will be deployed on Petrobras’ Lula field, formerly known as Tupi.

The hull, built at the Rio Grande shipyard in Rio Grande do Sul, weighs 52,000 tons. It is 288 meters long and 54 meters wide.

The P-68 floating, production, storage, and offloading unit will have a daily processing capacity of 150,000 barrels of oil and six million cubic meters of gas. It will be able to store up to 1.6 million barrels of oil per day.

After integration, the FPSO unit will be transported to the Santos Basin, off the coast of São Paulo.

Just last week, Petrobras started the oil and natural gas production in the Lapa field, in the Santos Basin pre-salt layer, through the FPSO Cidade de Caraguatatuba.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free