Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Hyperdynamics: Drillship change for Fatala well (Guinea)
Fossil Energy

January 6, 2017 · about 9 years ago

Hyperdynamics: Drillship change for Fatala well (Guinea)

After it recently announced a deal to take the Pacific Bora drillship for its Guinea drilling, oil company Hyperdynamics on Friday said there has been a change of plan – or rather, a change of drillship. Namely, the oil firm said it has accepted a proposal from its drilling contractor, Pacific Drill

2 minutes read
  • LinkedIn
  • X
  • Email

After it recently announced a deal to take the Pacific Bora drillship for its Guinea drilling, oil company Hyperdynamics on Friday said there has been a change of plan – or rather, a change of drillship.

Namely, the oil firm said it has accepted a proposal from its drilling contractor, Pacific Drilling, to deploy the Pacific Scirocco drillship in place of the Pacific Bora for Hyperdynamics’ upcoming Fatala deepwater exploration well offshore the Republic of Guinea.

Financial terms under the earlier contract with Pacific Drilling for the Pacific Bora are unchanged. Hyperdynamics plans to spud the Fatala-1 well in April 2017.

“We are very pleased to be able to engage the Pacific Scirocco for our drilling campaign,” said Hyperdynamics President and Chief Executive Officer Ray Leonard .

“The Pacific Scirocco is equipped to drill in deeper water — up to 12,000 feet — and could handle either of the two optional follow-up fan wells that may be drilled if the Fatala-1 well is successful.

“We understand that the Scirocco has been working offshore Nigeria for Total for the last five years and has achieved a 98% up-time record, with no lost-time incidents. Having a rig and a crew that has performed so consistently at such a high level of safety and efficiency should greatly enhance our program,” Leonard said.

“The Scirocco completes its current contract with Total on January 19 and afterwards will be anchored offshore Abidjan, Ivory Coast. This will enable Schlumberger, our integrated project manager for drilling services, to utilize its base there to outfit the drillship in plenty of time for an April 2017 spud date,” he added.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free