Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›Maersk Drilling’s new XLE jack-up set for North Sea
Exploration & Production

January 6, 2017 · about 9 years ago

Maersk Drilling’s new XLE jack-up set for North Sea

Danish offshore driller Maersk Drilling has taken delivery of its fourth XLE jack-up rig, the Maersk Invincible, from Daewoo Shipbuilding and Marine Engineering (DSME) in South Korea. The company’s fourth and final XL Enhanced ultra harsh environment jack-up was named in South Korea in October 2016.

1 minutes read
  • LinkedIn
  • X
  • Email

Danish offshore driller Maersk Drilling has taken delivery of its fourth XLE jack-up rig, the Maersk Invincible, from Daewoo Shipbuilding and Marine Engineering (DSME) in South Korea.

The company’s fourth and final XL Enhanced ultra harsh environment jack-up was named in South Korea in October 2016. The first three jack-up rigs have been delivered from the Keppel FELS shipyard.

The driller said on Friday, January 6 that Maersk Invincible will now mobilize to the North Sea and will in the second quarter of 2017 start a five-year firm contract with Aker BP for plug and abandonment work on the Valhall field.

With a leg length of 206.8 meters (678 ft.), Marsk says the rigs are the world’s largest jack-up rigs and are designed for year round operation in the North Sea, in water depths up to 150 m (492 ft.).

According to the owner, uptime and drilling efficiency are maximized through dual pipe handling. While one string is working in the well bore, a second string of e.g. casing, drill pipe or bottom hole assembly can be assembled/disassembled and stored in the set-back area, ready for subsequent transfer for use in the well bore thus reducing the non-productive time.

The drill floor features Multi Machine Control – a fully remote operated pipe handling system allowing all standard operations such as stand building and tripping to be conducted without personnel on the drill floor.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

16 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

16 days ago
Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

16 days ago