Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Marine Warranty Surveyor Wanted for COBRAcable
Offshore Wind

January 31, 2017 · about 9 years ago

Marine Warranty Surveyor Wanted for COBRAcable

Energinet.dk is looking to pre-qualify companies which will participate in a tender for a Marine Warranty Surveyor contract worth EUR 600,000 for offshore cable laying and cable protection at the COBRAcable interconnector that will link Denmark and the Netherlands.

2 minutes read
  • LinkedIn
  • X
  • Email

Energinet.dk is looking to pre-qualify companies which will participate in a tender for a Marine Warranty Surveyor contract worth EUR 600,000 for offshore cable laying and cable protection at the COBRAcable interconnector that will link Denmark and the Netherlands.

Danish transmission system operator will pre-qualify 3-5 applicants who are evaluated as most qualified and only these applicants will be invited to submit a tender. Interested parties can apply until 13 February.

The COBRAcable, being developed by TenneT and Energinet.dk, will have a capacity of 700MW and will run from Eemshaven in the Netherlands, via the German sector of the North Sea to Endrup in Denmark. The interconnector will make Dutch capacity structurally available to the Danish electricity grid, and vice versa. It will also be designed in such a way as to enable the connection of an offshore wind farm at a later stage.

Prysmian is in charge of the turn-key supply and installation of an HVDC bipole cable – using single core cables with extruded insulation technology – that will operate at a voltage level of ±320 kV with a rating of approximately 700MW.

The interconnector will run along a total route of around 325 kilometres and will include two onshore lengths of 1 km on the Dutch side and 25 km on the Danish side to link to the onshore converter stations, which are to be provided under separate contract by Siemens .

Preparations for the construction of the converter stations at Eemshaven and Endrup have already started, with work on the construction of the cable due to start in mid-2017.

TenneT and Energinet.dk will also install a fibre-optic data link alongside the COBRAcable interconnector itself, in order to exchange the necessary information about the interconnection.

Offshore WIND Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & FinanceProject & TendersStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free