Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Heavy Lifters Turn to Less Traditional Markets
News

February 13, 2017 · about 9 years ago

Heavy Lifters Turn to Less Traditional Markets

A troublesome outlook for heavy lift vessels within the market for topside and jacket installation, prompted by challenging market in recent years, has led contractors to seek out opportunities in less traditional markets. Two such bright spots are offshore wind and decommissioning, according to Dou

2 minutes read
  • LinkedIn
  • X
  • Email

A troublesome outlook for heavy lift vessels within the market for topside and jacket installation, prompted by challenging market in recent years, has led contractors to seek out opportunities in less traditional markets.

Two such bright spots are offshore wind and decommissioning, according to Douglas Westwood, an energy intelligence group, which claims that the former is becoming increasingly-attractive as the volume of installed turbines per year grows rapidly and the projects become larger and further from shore.

The HLV contractors have seen a major decline in fixed platform installations and this year is expected to result in c.45% less fixed assets installed when compared to 2014 levels.

As explained, the strategic advantage of HLVs is their cost effectiveness as both sectors seek out most economical solutions. As such, in a market where day rates are often driven by tonnage requirements, super heavy lift vessels may have a somewhat-limited market reach and vessels that are over specified will risk lower day rates, the intelligence group adds.

For HLVs venturing into turbine installation market crane capacity in the range of 1,500-3,000T is suitable for most offshore wind installations and sufficient deck space with the ability to carry at least 4 monopiles typically preferred.

For HLVs with lifting capacity >5,000T, decommissioning represents a significant opportunity, particularly within the North Sea which is characterized by large platforms – c.40% of platforms within the UK and c.85% of platforms within Norway have a combined substructure and topside weight >5,000T.

Until recently the largest single lift decommissioning operation had been the removal of the Frigg TCP2 MSF, weighing in at 8,500T.

However, “with the introduction of super heavy lift vessels such as Allsea’s Pioneering Spirit, Heerema’s Sleipnir (due for delivery in 2019) as well as recent orders from Shandong Twin Marine for two vessels with lifting capacity of 34,000T, it is hoped that the decommissioning of the North Sea’s heaviest platforms will become more efficient,” Douglas Westwood concludes.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free