Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Offshore Structures Britain Ships Out Final Walney Extension Transition Pieces
News

May 4, 2017 · about 9 years ago

Offshore Structures Britain Ships Out Final Walney Extension Transition Pieces

Offshore Structures Britain (OSB) has shipped out the last six transition pieces built for DONG Energy’s Walney Extension offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Offshore Structures Britain (OSB) has shipped out the last six transition pieces built for DONG Energy’s Walney Extension offshore wind farm.

OSB, a Teesside-based joint venture between EEW SPC and Bladt Industries, has now delivered a total of 40 transition pieces for the project which will comprise 87 turbines, with Bladt Industries producing the remaining 47 TPs.

The 660MW Walney Extension is located off the west coast of England, next to the 367.2MW Walney offshore wind farm.

The wind farm will consist of 40 8MW MHI Vestas and 47 7MW Siemens wind turbines and will be the largest wind farm in the world when built and commissioned in 2019.

OSB, which was officially opened in September 2015 , also fabricated 16 transition pieces for the recently fully commissioned Burbo Bank Extension, the first commercial offshore wind farm to feature 8MW turbines.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul makes its entrance into CCS market with North Sea pipeline project
  2. 2Floatel’s 2016-built semi-submersible vessel lines up Brazilian job
  3. 3PTTEP, Petronas’ 35-year gas deals bolster Thailand-Malaysia energy security axis
  4. 4Well-Safe and NMC Energy join forces for North Sea decommissioning push

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free