Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Work Plan: Additional $16.5 Million Slotted for USACE Detroit
Dredging

June 7, 2017 · about 9 years ago

Work Plan: Additional $16.5 Million Slotted for USACE Detroit

The U.S. Army Corps of Engineers, Detroit District, has announced additions to its fiscal year 2017 program based on the recently approved Work Plan. The additional $16.5 million will be used in 2017 to repair breakwaters, dredge harbors, repair critical components at the Soo Locks and complete vari

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Detroit District, has announced additions to its fiscal year 2017 program based on the recently approved Work Plan.

The additional $16.5 million will be used in 2017 to repair breakwaters, dredge harbors, repair critical components at the Soo Locks and complete various projects and studies throughout the Great Lakes.

“These Work Plan funds will help address the most critical needs in six of our harbors around the Great Lakes,” said Lt. Col. Dennis Sugrue, district engineer, U.S. Army Corps of Engineers, Detroit District. “We construct, maintain and operate key infrastructure projects that are crucial to the Nation’s economy, environment, safety and quality of life, now and in the future.”

The work plan was developed when Congress appropriated additional funding for ongoing work in the fiscal year 2017 Energy & Water Development Appropriations Act as contained in the 2017 Consolidated Appropriations Act. The Corps developed an allocation plan for high priority work packages based on the criteria established by Congress.

In addition to the projects being completed from the 2017 President’s budget of $67.5 million, the Detroit District’s work plan increase of $16.5 million includes four dredging projects and eight repair, replacement, or construction projects. In addition, the work plan includes design funding for two environmental projects.

Projects that will be executed as a result of the fiscal year 2017 work plan include the following:

Dredging projects

Operations and Maintenance

Construction

Studies

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free