Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›All Seasons Marina Dredging Plan on the Table
Dredging

June 9, 2017 · about 9 years ago

All Seasons Marina Dredging Plan on the Table

All Seasons Marina (within Neshaminy State Park) proposes to perform maintenance dredging, by hydraulic (cutterhead – pipeline) method, within an existing marina basin, the U.S. Army Corps of Engineers, Philadelphia District, announced. The applicant is seeking a 10- year maintenance permit, with an

1 minutes read
  • LinkedIn
  • X
  • Email

All Seasons Marina (within Neshaminy State Park) proposes to perform maintenance dredging, by hydraulic (cutterhead – pipeline) method, within an existing marina basin, the U.S. Army Corps of Engineers, Philadelphia District, announced.

The applicant is seeking a 10- year maintenance permit, with an initial dredging followed by up to three more dredging events over the ten years.

Under this plan , the initial dredging would remove a maximum of 21,000 cubic yards to a design depth of -4 feet at mean low water (MLW), with up to 2 feet of allowable over-dredge, for a maximum dredging depth of -6 feet (MLW).

The area initially proposed for dredging is approximately 2.73 acres out of the 13.9-acre basin.

With up to 21,000 cubic yards dredged in each follow-up maintenance event within the basin, the maximum volume to be dredged over 10 years would be 84,000 cubic yards.

The proposed disposal site is an existing 6.4-acre confined disposal facility (CDF) located on the property immediately to the east of the marina basin and parking lot.

Public comment deadline is on June 16, 2017, USACE said.

[mappress mapid=”24175″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free