Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Ecology OKs Permits for Proposed Kalama Port Project
Dredging

June 9, 2017 · about 9 years ago

Ecology OKs Permits for Proposed Kalama Port Project

The Washington Department of Ecology has approved a shoreline permit and granted water quality certification tied to a proposed project to manufacture and export methanol at the Port of Kalama. These are two in a series of required permits from local, state and federal agencies needed to move the pr

1 minutes read
  • LinkedIn
  • X
  • Email

The Washington Department of Ecology has approved a shoreline permit and granted water quality certification tied to a proposed project to manufacture and export methanol at the Port of Kalama.

These are two in a series of required permits from local, state and federal agencies needed to move the proposal forward.

The shoreline permit sets stringent conditions that the Port of Kalama and Northwest Innovation Works (NWIW) – the two entities seeking to construct and operate the industrial facility – must meet to protect the shoreline ecosystem and water quality while requiring site-specific mitigation to offset environmental impacts.

Cowlitz County and the port completed the final environmental review for the project in September 2016.

NWIW and the port sought the shoreline conditional use permit from Cowlitz County because some proposed construction activities and related dredging work are located in and along the Columbia River.

After the county approved the permit, state law requires Ecology to then evaluate the permit application.

Some conditions in Ecology’s shoreline permit require NWIW and the port to:

[mappress mapid=”24173″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free