Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›‘COSLPromoter’ under safety audit second time this year
Fossil Energy

June 21, 2017 · about 9 years ago

‘COSLPromoter’ under safety audit second time this year

The Norwegian offshore safety body, the Petroleum Safety Authority (PSA), has found two improvement points during an audit of the COSLPromoter semi-submersible drilling rig. The PSA said on Wednesday that the audit was conducted on June 7 and 8 and that it focused on the management of integrity in s

1 minutes read
  • LinkedIn
  • X
  • Email

The Norwegian offshore safety body, the Petroleum Safety Authority (PSA), has found two improvement points during an audit of the COSLPromoter semi-submersible drilling rig.

The PSA said on Wednesday that the audit was conducted on June 7 and 8 and that it focused on the management of integrity in structures and marine systems.

According to the safety regulator, the purpose of the audit was to confirm that the COSLPromoter had good systems for verifying structures and marine systems, specifically in respect of the scope of inspections, methodology, and assessment of inspection results.

There were no regulatory non-conformities found during the audit. However, the PSA identified two improvement points concerning the verification of watertight valves in the ventilation plant and the closing time performance requirements for shutting watertight doors by hand pump.

As far as the rig is concerned, the COSLPromoter is a semi-submersible designed to operate in water depths up to 750 meters. The unit is made for harsh environments like the North and Norwegian seas. The rig is of GM4000 design built at Yantai Raffles Shipyard, China.

The agency told COSL to report on how the improvements point will be assessed by July 15, 2017, at the latest.

The last time the rig was under the scope of the PSA was in late April . Similar to this audit, only an improvement point was found while no non-conformities were identified.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free