Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Shoreline Protection Project in Marshfield up for Comment
Dredging

July 5, 2017 · about 9 years ago

Shoreline Protection Project in Marshfield up for Comment

The U.S. Army Corps of Engineers, New England District, is proposing to undertake emergency shoreline protection by constructing a mixed sediment revetment in front of a 300-foot section of seawall in the Brant Rock/Hewitt’s Point section of Marshfield, Mass. The purpose of the proposed project is t

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is proposing to undertake emergency shoreline protection by constructing a mixed sediment revetment in front of a 300-foot section of seawall in the Brant Rock/Hewitt’s Point section of Marshfield, Mass .

The purpose of the proposed project is to prevent further beach scour and protect the Brant Rock seawall so that it continues to provide protection for the backshore properties of Brant Rock and its associated roads and public infrastructure.

According to the Corps, protecting the seawall’s toe would ensure the wall does not fail in the future and continues to provide protection for the backshore properties of Brant Rock and its associated roads and other public infrastructure.

The proposed project to prevent further beach scour consists of the construction of a cobble/sand revetment (berm) along the seawall beginning near Franklin Street and extending approximately 300 feet to the south.

Approximately every five years the town will need to maintain the revetment by replacing lost sand gravel and cobble fill.

Deadline for sending comments on the proposed emergency shoreline protection project is August 3, 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free