Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Report: CMA CGM Picks Chinese Yards to Build World’s Largest Boxships
Shipbuilding

August 18, 2017 · about 9 years ago

Report: CMA CGM Picks Chinese Yards to Build World’s Largest Boxships

French liner major CMA CGM has reportedly signed a letter of intent (LOI) with two Chinese yards on the construction of up to nine 22,000 TEU megaships. Specifically, in line with the LOI, CSSC Hudong-Zhonghua would be in charge of constructing five ships from the batch, while Shanghai Waigaoqiao Sh

2 minutes read
  • LinkedIn
  • X
  • Email

French liner major CMA CGM has reportedly signed a letter of intent (LOI) with two Chinese yards on the construction of up to nine 22,000 TEU megaships.

Specifically, in line with the LOI, CSSC Hudong-Zhonghua would be in charge of constructing five ships from the batch, while Shanghai Waigaoqiao Shipbuilding (SWS) would be entrusted with building the remaining four units, a South Korean securities brokerage company said .

Previous reports identified SWS as the main competitor for the deal alongside its South Korean rival Hyundai Heavy Industries (HHI). The order, estimated to be worth USD 1.5bn, is said to be comprised of six firm ships and three options.

The ships, world’s largest, would feature dual-fuel engines, and be powered by LNG.

The boxship giants are likely to be delivered by 2020.

Neither of the three companies has replied to World Maritime News to the market rumors on the deal so far.

If confirmed, the ships would disrupt the abstention from new orders for big ships present on the market since the third quarter of 2015, adding further to the overall overcapacity in the container shipping sector.

According to Drewry, the existing orderbook is already close to 3 million TEU due by the end of 2020, to add the active fleet that recently passed the 20 million TEU milestone.

The bulk of new deliveries will arrive before 2019 and are heavily skewed at the top end of the range with 18,000+ TEU units taking up nearly 40% of the orderbook.

Speaking of the alleged order, Søren Skou, CEO of Maersk, Danish shipping conglomerate, said there is no incentive to order new ultra large containerships from a cost perspective right now, despite extremely low prices of newbuilding tonnage.

As highlighted by Skou, five years ago large ships were ordered due to fuel economy, however, this advantage has been minimized, if not disappeared entirely, given the current oil price levels.

World Maritime News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free