Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›Hyperdynamics ‘nearly finished with the most difficult portion’ of Fatala well
Exploration & Production

August 25, 2017 · about 9 years ago

Hyperdynamics ‘nearly finished with the most difficult portion’ of Fatala well

Oil and gas company Hyperdynamics is nearly finished with the most difficult portion of its Fatala-1 exploration well offshore Guinea. The well is being drilled with the Pacific Drilling-owned drillship Pacific Scirocco, which arrived at location in early August. Hyperdynamics said on Friday that, a

2 minutes read
  • LinkedIn
  • X
  • Email

Oil and gas company Hyperdynamics is nearly finished with the most difficult portion of its Fatala-1 exploration well offshore Guinea.

The well is being drilled with the Pacific Drilling-owned drillship Pacific Scirocco, which arrived at location in early August.

Hyperdynamics said on Friday that, after placing the 36-inch conductor casing into the sea floor, the 26″ hole was drilled to 3,829 meters below sea level, the 20-inch surface casing was run and cemented into place at a depth of 3,820 meters below sea level, or 923 meters below sea bottom. “We successfully achieved a casing installation of less than one degree off vertical inclination, providing a safe and solid foundation for the installation of the blowout preventer (BOP),” said the company.

Furthermore, the BOP stack was successfully surface tested, connected to the lower marine riser package and the first joints of the drilling riser, then run through to the sea bottom; all control systems were tested and are fully functioning.

The BOP stack has been lowered onto the sea floor, latched onto the 20-inch wellhead housing and will be pressure and function tested before drilling out the 20-inch casing shoe.

Hyperdynamics further stated that the casing shoe will be leak tested to verify that the cement has been solidly set within the formation. This will be followed by drilling the 17½ inch hole to an estimated depth of 1,678 meters below sea bottom, where the 13-3/8-inch casing will be set above the potentially hydrocarbon-bearing intervals at a depth of approximately 1,980 meters below sea bottom.

“I’m pleased to report that we are nearly finished with the top portion of the Fatala-1 well, which is the most difficult and exacting portion of the well at this extreme water depth,” said Ray Leonard , President and Chief Executive Officer of Hyperdynamics.

“In the final drilling stage, we will drill the 12-1/4 inch hole through the interval that we believe holds the potential for a world-class hydrocarbon discovery,” he said.

Hyperdynamics is the operator and a 50-50 partner in this exploration project with SAPETRO, an African focused privately held oil and gas exploration and production company with a portfolio of high-quality assets in West and East Africa.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

17 days ago