Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Second Japan Drilling jack-up finds work on Al Shaheen
Business & Finance

October 10, 2017 · about 8 years ago

Second Japan Drilling jack-up finds work on Al Shaheen

Japan Drilling has found work for another jack-up rig with the North Oil Company on the giant Al Shaheen oil field offshore Qatar. This will be a second rig deal awarded to Japan Drilling on the Al Shaheen field after the Hakuryu 12 jack-up was awarded a two-year firm deal with the NOC in early June

2 minutes read
  • LinkedIn
  • X
  • Email

Japan Drilling has found work for another jack-up rig with the North Oil Company on the giant Al Shaheen oil field offshore Qatar.

This will be a second rig deal awarded to Japan Drilling on the Al Shaheen field after the Hakuryu 12 jack-up was awarded a two-year firm deal with the NOC in early June.

The company said on Tuesday that the Hakuryu 10 jack-up rig was also awarded a two-year deal with additional two one-year extension options.

Japan Drilling added that the contract, signed on October 10 and scheduled to start in January 2018, was worth around $46 million, not including the possible extensions.

The rig is a Baker Marine Pacific Class 375 three-leg self-elevating cantilever type drilling rig built by PPL Shipyard, Singapore, in 2008. According to specs, the Hakuryu 10 has a maximum drilling depth of 30,000 ft (9,144 m) and can accommodate 120 people.

According to InfieldRigs, the Hakuryu 10 is currently ready-stacked in Indonesia.

Al Shaheen

The Al Shaheen field is among the world’s largest oil fields. It has been producing oil for over 20 years and holds the potential to produce a few-fold of the oil it has produced so far. It currently produces around 40% of Qatar’s crude oil, at around 300,000 barrels per day.

The field was operated by Maersk Oil until July 2017 at which time its 25-year production sharing agreement with Qatar Petroleum expired.

The operatorship of the giant Qatari field was taken over by NOC , a joint venture company between Qatar Petroleum and French oil major Total.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceExploration & Production

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

17 days ago