Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Exploration & Production›Mubadala completes two development wells on Manora
Exploration & Production

November 6, 2017 · about 8 years ago

Mubadala completes two development wells on Manora

Mubadala Petroleum has completed the drilling of two development wells on the Manora field in the G1/48 concession in the Gulf of Thailand.

2 minutes read
  • LinkedIn
  • X
  • Email

Mubadala Petroleum has completed the drilling of two development wells on the Manora field in the G1/48 concession in the Gulf of Thailand.

Mubadala Petroleum is the operator of the field with 60% interest and Tap Oil is its partner with 30% interest.

The drilling program started in October using the Atwood Orca jack-up drilling rig, which has now completed the drilling of the MNA-18 and MNA-19 development wells.

The campaign also planned for an exploration well and the rig is currently preparing to spud the Ladawan-D exploration well. A further exploration well, targeting the L prospect is planned to be drilled as part of the current campaign, Tap Oil informed on Monday.

Development drilling results

According to Tap Oil, the MNA-19 infill well targeted 600 series sandstone reservoirs in the Central Fault Block. The primary target reservoirs all came in on prognosis and are oil-bearing with petrophysical interpretation of 118 feet of oil pay. The well has been completed with an electric submersible pump (ESP) and is currently producing at a restricted rate of 900 barrels of oil per day (bopd), while being chocked back in order to assess the overall impact on surrounding wells before optimizing production rates. The well took approximately 15 days versus a planned 19 days to drill and complete.

The MNA-18 development well encountered approximately 87 feet of oil-bearing pay in the primary target, the 500 series sandstone reservoirs in the Eastern Fault Block; and 68 feet of oil pay in the secondary target, the 600 series reservoirs. The well is currently being completed in the 500 series reservoirs with an ESP with expected start up rate of ca. 1500 barrels of oil per day. The well took 16 days versus a planned 21 days to drill and complete.

The Manora field is currently producing approximately 7,000 bopd ahead of MNA-18 being brought online and production is expected to average between 6,800 – 7,100 bopd (gross) during calendar year 2017.

Ladawan-D Exploration Prospect

The Ladawan-D well is targeting the geological equivalent of the 500 sand series found in the Manora field. The prospect is located approximately 10 km from the Manora Platform, outside of the Manora Production Area. In the event of success, it is estimated that the Manora field life could be extended by approximately two years.

A reservation fee is payable to hold acreage in the G1/48 permit outside of the Production Area, which can be offset against exploration costs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Exploration & ProductionProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago

Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

17 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

17 days ago
Fugro to start offshore survey program in Timor-Leste this year
Business & Finance

Fugro to start offshore survey program in Timor-Leste this year

17 days ago