Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Meeting on Souris River Basin Feasibility Study in Minot, ND
Dredging

November 10, 2017 · about 8 years ago

Meeting on Souris River Basin Feasibility Study in Minot, ND

The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, are holding a public meeting to discuss the draft Souris “Mouse” River Basin Feasibility Study and Environmental Assessment on November 16. The meeting will be held at the Minot Municipal

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, are holding a public meeting to discuss the draft Souris “Mouse” River Basin Feasibility Study and Environmental Assessment on November 16.

The meeting will be held at the Minot Municipal Auditorium in Minot, North Dakota. An open house will begin at 6:30 p.m., followed by a formal presentation and public comments/input from 7-9 p.m, said USACE.

The purpose of the feasibility study is to assess the interconnected system of reservoirs, levees and channels within this basin and recommend modifications to existing infrastructure and potential new measures to reduce the risk of flooding.

USACE’s feasibility study is the first step toward a federal flood risk reduction project, and its purpose is to provide Congress with the information it needs to authorize a project for implementation.

The proposed project consists of the construction of what is currently referred to as the ‘Maple Diversion’ or high-flow bypass along with a short tieback levee east of the U.S. 83 Bypass within the city of Minot. The Maple Diversion is a feature of the SRJB’s larger Mouse River Enhanced Flood Protection Project.

The public review period will end November 30.

[mappress mapid=”24603″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free