Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Willamette River Dredging Plan on the Table
Dredging

November 17, 2017 · about 8 years ago

Willamette River Dredging Plan on the Table

The U.S. Army Corps of Engineers, Portland District, has received an application from Marion County (OR) for a Department of the Army permit related to the dredging work in waters of the United States. The proposed project involves annual removal of a maximum of 800 cubic yards (CY) of sand, silt, a

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Portland District, has received an application from Marion County (OR) for a Department of the Army permit related to the dredging work in waters of the United States.

The proposed project involves annual removal of a maximum of 800 cubic yards (CY) of sand, silt, and gravel from below the ordinary high water mark of the Willamette River at river mile 106.5.

According to the applicant, purpose of the project is to maintain adequate water depth within the Willamette River to safely operate the ferry at the Buena Vista Crossing.

The applicant is proposing to mechanically dredge gravel and other material using a bucket mounted on a trackhoe. Excavated materials would be placed onto a barge with side rails and the dredged material removed from the ferry’s path would be barged downstream and discharged below the ordinary high water mark.

The Corps reported that the proposed project includes annual maintenance dredging for a period of 10 years. Prior to each maintenance dredging cycle the applicant would be required to coordinate with the Corps and the PSET to determine if additional sediment testing is required.

Deadline for sending written comments on the proposed work is December 14, 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free