Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›POLA Calls for Reauthorization of the RGP No. 65
Dredging

November 21, 2017 · about 8 years ago

POLA Calls for Reauthorization of the RGP No. 65

The Port of Los Angeles, Engineering Division, has submitted an application to the U.S. Army Corps of Engineers for reauthorization of the RGP No 65 (Regional General Permit) for routine wharf and pile maintenance work at the port. According to the applicant, activities conducted under RGP 65 would

1 minutes read
  • LinkedIn
  • X
  • Email

The Port of Los Angeles, Engineering Division, has submitted an application to the U.S. Army Corps of Engineers for reauthorization of the RGP No 65 (Regional General Permit) for routine wharf and pile maintenance work at the port.

According to the applicant, activities conducted under RGP 65 would include routine wharf and pile maintenance work (in-kind replacement, repairs, and maintenance) in the Los Angeles Harbor similar to the maintenance activities that have occurred under the two prior versions of RGP 65.

“ To this end, the applicant proposes in-kind replacement of deteriorated decking, joists, pile caps, fender piles, front marginal beams, rear marginal beams, pile wraps, bull rails, bearing piles made of concrete, timber or steel, seawalls, and all other structural members that would require replacement due to age or damage. The applicant would install new or replacement piles using a vibratory hydraulic hammer device ,” reported the Corps.

With the proposed reauthorization, the applicant has also proposed to repair damage to existing seawalls, bulkheads, and restore rock revetment and/or rock dikes to original slopes by placing rock within the existing fill footprint. As with all RGPs, the reauthorization would be for 5 years.

Comment period for the project is November 20, 2017 through December 20, 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free