Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Heron Backhoe Busy at Eastland Port
Dredging

December 6, 2017 · about 8 years ago

Heron Backhoe Busy at Eastland Port

The towering spuds of a hired backhoe dredger will be visible at Eastland Port this week as maintenance dredging in front of wharf 7 and 8, and in the navigation channel begins, Eastland Group said in their latest announcement. The 32 meter high spuds, or anchors, are part of a GPK backhoe dredge hi

1 minutes read
  • LinkedIn
  • X
  • Email

The towering spuds of a hired backhoe dredger will be visible at Eastland Port this week as maintenance dredging in front of wharf 7 and 8, and in the navigation channel begins, Eastland Group said in their latest announcement.

The 32 meter high spuds, or anchors, are part of a GPK backhoe dredge hired from Heron Construction.

The dredging is set to begin today in order to re-establish the normal depth of 10.5 meters in front of wharf 7 and 8.

Eastland Port general manager, Andrew Gaddum , says that they can dredge a wide range of materials very precisely, and operate well in shallow and enclosed waters.

“The dredger is being used to clear away hard material such as papa rock and mudstone which has built up and created high spots in front of the wharves where the biggest ships berth,” said Gaddum.

The port’s suction hopper dredge Pukunui will take dredged material to the port’s normal disposal site 3.7km from the end of the channel out in Poverty Bay.

The maintenance dredging campaign is expected to last for four days, and will include dredging in the navigational channel. Approximately 4,500 thousand cubic tonnes of dredged sediment will be removed from the areas.

[mappress mapid=”24657″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free