Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Quebec Port Authority Unveils Plan for Beauport Terminal
Dredging

December 13, 2017 · about 8 years ago

Quebec Port Authority Unveils Plan for Beauport Terminal

The Quebec Port Authority (QPA) yesterday introduced its plan to build a container terminal at the site of the Beauport 2020 project. This initiative, part of the Beauport 2020 expansion project, is the culmination of a lengthy process conducted by QPA to identify economic niches with the highest po

1 minutes read
  • LinkedIn
  • X
  • Email

The Quebec Port Authority (QPA) yesterday introduced its plan to build a container terminal at the site of the Beauport 2020 project .

This initiative, part of the Beauport 2020 expansion project, is the culmination of a lengthy process conducted by QPA to identify economic niches with the highest potential for the future port’s development.

After multiple technical and commercial studies, QPA has come to the conclusion that building a container terminal at the Beauport 2020 site is the best way to leverage this space.

In a speech to the Quebec City Chamber of Commerce and Industry, port president and CEO Mario Girard stressed that the Port of Quebec has all the strategic advantages needed to carry out this major project. With its water depth of 15 meters and full intermodality, Quebec City has a distinctive advantage in the St. Lawrence – Great Lakes Trade Corridor.

Mr. Girard pointed out that the opening of the new 15-meter-deep Panama Canal in 2016 and the emergence of next-generation ships requiring deep-water ports is completely changing the landscape of commercial shipping.

This new 15-meter standard makes it harder for the St. Lawrence, as it currently stands, to compete with American ports in the container market, said QPA in their release.

Key aspects of the Beauport container terminal project:

[mappress mapid=”24679″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free