Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Hapag-Lloyd Highlights Importance of Elbe Deepening
Dredging

December 26, 2017 · about 8 years ago

Hapag-Lloyd Highlights Importance of Elbe Deepening

German container shipping company Hapag-Lloyd is calling for more leeway and the deepening of the river Elbe which would enable mega boxships to reach the Port of Hamburg. The Lower Elbe between the Port of Hamburg and the North Sea is supposed to be deepened over a distance of approximately 120 kil

1 minutes read
  • LinkedIn
  • X
  • Email

German container shipping company Hapag-Lloyd is calling for more leeway and the deepening of the river Elbe which would enable mega boxships to reach the Port of Hamburg.

The Lower Elbe between the Port of Hamburg and the North Sea is supposed to be deepened over a distance of approximately 120 kilometers. The goal is to make it easier for the new generation of container ships to reach the city, said Hapag-Lloyd.

“Besides deepening, it’s also about widening the fairway. These measures would make it easier for the new ships to get into and back out of the port ,” said Rolf Habben Jansen, CEO of Hapag-Lloyd AG.

This means that more containers could be brought to the city, which in turn would shorten waiting times and lower costs, he added.

Why is it necessary to deepen the Elbe?

These days, some of the vessels being built have slots for 20,000 containers and measure 400 meters long and more than 60 meters wide.

They should have an opportunity to be able to call at Hamburg – Germany’s largest port and an important job engine for the country’s economy – with a draft of 13.5 meters and, at high tide, with a draft of 14.5 meters, Hapag-Lloyd said.

To also be able to guarantee the ships’ safety even in rough waters, the fairway must be dredged to some 19 meters beneath sea level.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free