Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Meeting Scheduled for Missouri River Sandbar Habitat Scheme
Dredging

January 16, 2018 · about 8 years ago

Meeting Scheduled for Missouri River Sandbar Habitat Scheme

The U.S. Army Corps of Engineers will hold a public meeting tomorrow at the Ramada Bismarck Hotel in Bismarck, ND, to gather input on site selection for an Emergent Sandbar Habitat (ESH) Project within the Missouri River between Garrison and Oahe dams. The meeting will run from 6 to 8 p.m. with a br

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers will hold a public meeting tomorrow at the Ramada Bismarck Hotel in Bismarck, ND, to gather input on site selection for an Emergent Sandbar Habitat (ESH) Project within the Missouri River between Garrison and Oahe dams.

The meeting will run from 6 to 8 p.m. with a brief opening presentation followed by an open house session.

“ During the open house, the Corps project team will be available at information stations to answer questions and gather public input. Concerns, comments and suggestions provided at this meeting will help the Corps determine which of three potential sites may be chosen for the project ,” USACE said in its announcement.

The proposed project includes mechanical construction of sandbar habitat, up to 40 acres in size, at one of three existing sandbar habitat sites between river miles 1349 and 1367 (near Washburn, ND).

According to USACE, material would be borrowed from the river bed and placed on top of the existing shallow submerged sandbar. This minimizes the amount of material that needs to be moved and increases longevity of the constructed sandbar.

[mappress mapid=”24750″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free